MEP
Power, lighting and distribution with full test and certification records.
Scope
An electrical installation is only finished when it has been tested and the results are written down. We hand over the certificates with the keys.
Circuits are designed to a load schedule and cables sized against that load, its route, its grouping and the protective device in front of it. Cable and load schedules are issued as part of the record, so the next person to touch the board can see what was intended.
Continuity, insulation resistance, earth fault loop impedance and RCD operation are tested and recorded per circuit. Results are issued as a certificate, not a verbal assurance.
Work on or near live systems is permit-controlled with lock-out/tag-out applied and proved dead before contact. There is no version of this job where that step is skipped because the schedule is tight.

Delivery
MEP
RECON HAUL LTD delivered our project beyond expectations. Professional team, great quality and on time.